Introduction
The current generating capacity level in the northern part of Nigeria is less than 50 percent of the demand, and the electricity supply system serves less than 40 percent of the population. This inadequacy subjects Nigerians especially in some areas to unreliable power supply and unscheduled power outages [1]. Studies have shown that electricity challenges in Nigeria are not only in the generation, but the electricity supply industry equally faces transmission challenges. The Nigerian grid system that transverses the country is now managed by the Transmission Company of Nigeria (TCN) as part of power deregulation. For the TCN to satisfy the increased electrical power demand, and our growing technological world which is deeply dependent upon the continuous availability of electrical power, electricity market participants in TCN transferring energy between various points often drive transmission lines close to or even beyond thermal, voltage and stability limits [2]. This can lead to fluctuations in power flows through the transmission lines with effects such as increased power loss, especially in congested lines as well as cascading outages that could result in power system collapse if not managed properly. The current average available transmission capacity on the 330/132 kV transformer is 11,165 MW with 98.2% of installed capacity with an average transmission loss of 10.5% [3]. A flexible AC Transmission System (FACTS) device especially the TCSC due to its power regulation can relieve congestion in some transmission lines that are overloaded and increase the voltage profile of some buses with low voltage supply which allows better utilization of the existing grid infrastructure, and along other benefits like maintaining a healthy system devoid of voltage fluctuations [4]. Availability and access to reliable and efficient electricity contribute to the growth of the economy and improvement in the standard of living of people in developing communities in North Central with the rapid increase in population and new technological advancement. Hence the need to effectively and efficiently compensate the existing structure of a 330 kV 35-bus Electric Network using a Thyristor Control Series Compensator (TCSC) is inevitable.
Literature Review
The component of electric power system in Nigeria consists of generation, transmission, and distribution. The basic components of the system include power, voltage and current, and frequency. All these parameters are discussed as follows.
Electric Power
There is real, reactive, and apparent power. The Real power is measured in watts and it is the amount of energy dissipated for the work to be done, while the reactive power is that required to generate the magnetic fields to enhance the actual work done whereas the apparent power is the total power that the utility company supplies normally which is measured in MVA. Power factor (PF) is an important parameter of power quality, it helps to reduce the harmonics in the line current, thereby increasing the efficiency and capacity of power systems and reducing high customer utility bills [5].
PF is a measure that shows how efficiently electricity is being used. It is calculated by dividing the real power (the power that actually does the work) by the apparent power (the total power supplied). Another way to understand it is as the cosine of the phase angle between the current and voltage waveforms, assuming they are pure sine waves.
[1]
Voltage and Current
Current and Voltage are essential quantities in electricity. Voltage serves as the cause while current is the effect. Voltage is the electrical force that drives an electric current between two points while current is the rate at which electric charge flows through a point in a circuit. Both combine to give power. There are different types of voltages namely: direct voltage (DC) and alternating voltage (AC) which correspond to types of current – direct current (DC) and alternating current (AC) respectively. The voltage in electric power transmission lines used to distribute electricity from power stations can be in several hundred times greater than the consumer voltages [6].
Frequency
Frequency meters are measured in hertz (Hz). Based on the grid code, our normal frequency level is supposed to be 50Hz. Frequency regulation is one of the most critical points in a power system. Quick response to the frequency correction within the power plant is an important issue since it prevents damage to the power transmission lines, equipment, and household appliances [7]. In a power grid system, load frequency control (LFC) also plays an essential role as it provides better conditions for power exchange and supply in trading electricity. Delays in such systems could reduce system performance and even cause parameter instability that could lead to a collapse of the grid system [8].
Table 2.3 below shows Basic Standard Value for allowed transmission system performance characteristics.
Normal Value | Tolerable Range | ||
|---|---|---|---|
Frequency | 50Hz | 48.75-51.25 | |
Voltage | 330 kV | 313.5 (0.95 pu) – 346.5 (1.05 pu) | |
Power Factor | 0.85 | - |
Methodology
The simulation model consists of Nigeria's 330 kV transmission grid system, thyristor-controlled series compensator (TCSC) model for power flow control in a transmission line, and the genetic algorithm for the optimal placement of TCSC. Results
The Nigeria 330kV Transmission Grid System
The 330 kV voltage level is regarded as extra-high voltage in Nigeria and is referred to as the Nigerian grid system. The Nigerian grid modeled in Power System Analysis Toolbox (PSAT) software simulated in MATLAB environment consists of thirty-five (35) buses, twenty-six (26) transmission lines, and eleven (10) working generating stations considered as at the time of this work. The Nigerian grid is made up of approximately 5,523.7 Km of 330 kV transmission lines and thirty-two 330/132 kV substations with a total installed transformer capacity of 12,688 MVA on average. The available capacity on the 330/132kV is 10,364 MVA [9]. The bus at Egbin Generating Station is chosen as the slack bus. Table 3.1 shows the installed capacity of the nine power generating stations and the type of fuel used.
Table 3.1. Electricity Power Stations of the Nigerian Power Grid
Power Stations | Fuel/Type Used | Installed Capacity (MW) | |
|---|---|---|---|
Afam | Thermal | 726 | |
Ugheli Delta | Gas | 900 | |
Sapela | Gas | 1020 | |
Ihovbor | Thermal | 450 | |
Geregu | Gas | 414 | |
Egbin | Gas | 1320 | |
Kainji | Hydro | 760 | |
Shiroro | Hydro | 600 | |
Jebba | Hydro | 540 | |
Alaijo | Thermal | 960 | |
Kano |
| Hydro | 100 |
Source: PHCN (2023)
Optimization Technique - Genetic Algorithms (GA)
GA is one of optimization technique with quick and radical approach to optimization because of its independence on knowing the derivatives of the objective function. Genetic Algorithms (GA) is good for power system optimization, which offers significant advantages and better optimization performances. The basic concept is derived from the Darwin’s postulation of survival of the fittest, which implies only the best individuals will be selected on the account of defined fitness level to participate with their genetic parameters in the next generation [10]. G.A only works with coding of the parameters set, where the parameters themselves are not directly involved. For a given population (candidate buses) with overall system voltage enhancement is considered suitable for location of TCSC.
TCSC Model for Power Flow Control
The real and reactive power flows of the line connected between bus-𝑖 and bus-j having
series impedance as,
[2]
[3]
Also, for
[4]
[5]
Where are voltage magnitudes at bus-I and bus-j respectively.
– Voltage angle between bus-I and bus-j;
– Conductance between bus-I and bus-j;
– Susceptance between bus-I and bus-j.
Figure 3.1 Transmission Line with TCSC
Figure 3.2. PSAT model of Nigeria Power Grid without TCSC
Figure 3.3. PSAT model of Nigeria Power Grid with TCSC
Discussion
The results show the simulation of the Nigerian grid in Power System Analysis Toolbox (PSAT) software using MATLAB environment before introducing TCSC, and after optimal placement of TCSC. The Genetic Algorithm (GA) result shows the fitness level of individual candidate buses that participated in the optimal placement of TCSC for effectiveness and efficiency.
Table 4.1 TCSC placement values for candidate buses.
Bus | Candidate Buses | Fitness Function Level | |
|---|---|---|---|
2 | Bus 1_Birnin Kebbi | 0.1156 | |
4 | Bus 3_Jebba (TS) | 0.0711 | |
6 | Bus 7_Oshogbo | 0.3848 | |
8 | Bus 11_Ajoakuta | 0.1000 | |
10 | Bus 14_Gombe | 0.6818 | |
12 | Bus 10_Kaduna (Mando) | 0.1950 | |
14 | Bus 30_Shirro (HT) | 0.9735 | |
16 | Bus 27_Jebba | 0.3354 | |
18 | Bus 19_Alaoji | 0.1970 | |
20 | Bus 17_New Haven | 0.5699 | |
22 | Bus 32_Geregu (PS) | 0.0532 | |
24 | Bus 13_Jos | 0.3951 | |
26 | Bus 25_Sapele (HT) | 0.1821 | |
28 | Bus 15_Kano | 0.9871 | |
30 | Bus 22_Afam (HT) | 0.4354 |
Figure 4.1 TCSC placement of candidate bus of Grid System.
Table 4.1 and figure 4.1 shows the fitness level of the candidate buses of the Transmission Grid. After coding the parameters set of the candidate buses, candidate buses show their fitness level value which implies level of real power loss and voltage enhancement on the lines. Bus 3_Jebba (TS) and Bus 15_Kano recorded least and highest fitness level value respectively. Hence, Bus15_Kano is chosen having the highest fitness value, and this will result in least overall real power loss and better voltage quality.
Table 4.2 Voltage Profile of the Buses before and after placing TCSC on Grid System
Bus | Candidate Buses | Voltage Profile of Buses Before TCSC (kV) | Voltage Profile of Buses After TCSC (kV) | % Improvement of Voltage | ||
|---|---|---|---|---|---|---|
2 | Benin (TS)_2 | 353.40 | 360.54 | 2.02 | ||
4 | Kano_15 | 313.30 | 314.12 | 0.26 | ||
6 | Kaduna_10 | 320.43 | 331.10 | 3.33 | ||
8 | Ajoakuta_11 | 303.23 | 320.24 | 5.61 | ||
10 | Jos_13 | 332.23 | 341.45 | 2.78 | ||
12 | Gombe_14 | 305.56 | 310.25 | 1.53 | ||
14 | New Haven_17 | 325.45 | 328.52 | 0.94 | ||
16 | Shirror (HT)_30 | 351.61 | 360.20 | 2.44 | ||
18 | Geregu (PS)_32 | 331.64 | 352.35 | 6.24 | ||
Figure 4.2 Voltage Profile of the Buses before and after placing TCSC on the Grid System
Table 4.2 and figure 4.2 shows results obtained from the simulation of power flow studies of some exposed weak buses with low voltage as a result of heavily loaded transmission lines and phase angles. On placing TCSC, some buses that violated the statutory limits of voltage were compensated. The TCSC connected in series with the transmission line changes the line reactance to allow real power flow and reactive power as voltage is in phase with the line current. This boosts the voltage in a line with voltage drop. Table 4.2 shows the improved voltage of bus_11 (Ajoakuta), bus_10 (Kaduna) and bus_32 (Geregu) significantly increased by 5.61%, 3.33% and 6.24% respectively after TCSC placed in the network. Figure 4.2 shows the overall bus affected and TCSC compensation level.
Conclusion
The work shows a serious improvement in the voltage profile after TCSC was installed on the Nigerian 330 kV grid system, enabling the network to be effectively used close to its thermal limit while remain stable, reduce transmission line congestion and maintains grid stability. Bus_32 (Geregu PS) and bus_11 (Ajoakuta) experienced significant improvement in the voltage level by 6.24% and 5.61% respectively thereby decongesting those line impedances to maintain voltage stability and more power flow. The TCSC improves the overall network voltage profile of the grid system by 2.79%.
Acknowledgements
Not applicable.
Funding
This research received no external funding.
Conflict of Interest
The authors declare no conflict of interest.
Data Availability Statement
Not applicable.
AI Usage Disclosure
No generative AI tools were used.
Author Contributions
Conceptualization, Isah Abubakar Ipemida; methodology, Isah Abubakar Ipemida; analysis, all authors; writing—original draft, Isah Abubakar Ipemida; writing—review and editing, all authors. All authors have read and agreed to the published version of the manuscript.
References
- P. I. Obi and K. J. Offor, “Power Flow and Contingency Assessment of the Existing 330 kV Nigeria Power Grid to cope with the proposed increase in Power generation 2021” International Journal of Engineering Research and Technology (IJERT) Vol. 1 – Issue 4, 2012.
- J. Seymor, - “The seven types of power problem” http://www.eepublishers.co.2a/images/uploads/eng-
- N. G. Hingorani and Laszlo Gyugyi,” Understanding FACTS concepts and technology of Flexible AC Transmission Systems” IEEE Press.
- M. N Nwohu, “An Overview of Flexible AC Transmission Systems Technology” Department of Electrical/Computer Engineering, FUT Minna, pp.1-8, 2011.
- Compliance testing to the IEC 1000-3-2 (EN 61000- 3-2) AND IEC 1000-3-2 (EN 61000-3) Standards, application note 1273, Hewlett Packard co., Dec 2022.
- Current vs Voltage. www.diffen.com /difference/current vs voltage.
- J.S Behnam and J Shahnam , “Analysis on the application (2011) of PID Controller in the frequency contribution of gas turbine power plant” international journal of physical sciences Vol. 6(19) pp4519 – 527 http:// www.academic journals.org/IJPS.
- Sheldrake, (2003) Handbook of electrical Engineering for practitioners in the oil, Gas and petrochemical Industry, John Wily $ Sons Ltd W. Sussex, England.
- O.O Eseoso and F.O Odiase, (2012) Efficiency Improvement of Nigeria 330 kV Network using (FACTS) Devices. International Journal of Advances in Engineering & Technology. Vol.4 Issue1, 26-41.
- J. Ambafi, M. Nwohu, H. Ohize, O.Tola “Performance Evaluation of PSS and STATCOM on Oscillation Damping of a North-Central Power Network of Nigeria Grid System” International Journal of Engineering.